Montenegro Heat Source Plant Project
Construction unit: Heihei County Heating Co.
Project Location: Heishan County, Jinzhou City, Liaoning Province
Planned investment: about 400 million yuan, after the completion of the first phase of the project, it can supply 2.66 million GJ of heat per year, with a heating area of about 6.2 million m2, and after the completion of the second phase of the construction, the annual heating capacity will be about 4.5 million GJ.
Design content: preliminary design and construction drawing design of 3x116MW high-temperature hot water circulating fluidized bed boiler for Phase I project
Construction content: 5x116MW high-temperature hot water circulating fluidized bed boiler and supporting pipeline network.